Mission #18 (OTN200)

Status
  • Battery: -> V
  • AmpHrs:
  • LeakDetect: OK
  • Vacuum: inHg

Mission Diagnostics Page

Mission ran from (2013-03-29 16:25:00 til 2013-04-18 14:10:00)
Posted By:
pye @
2013-03-29 16:31:41
Glider deployed by Adam Comeau and Mathieu Dever at 16:26 UTC. Glider deployed with inactive optode due to errors between optode and science computer. Plan is to run to HL5 and then adjust mission to fit in with the AZMP cruise.
pye @
2013-04-02 16:51:34
Set pinger min_depth with !put u_alt_min_depth 10
pye @
2013-04-10 14:02:13
Waypoint list was updated in order to better rendezvous with the Hudson on its AZMP Monitoring Program cruise. Anticipate co-location on 12 April around noon near Halifax Line Station 5.
acomeau @
2013-04-11 10:51:09
At 7:48 am localtime at 11-Apr-2013 I updated the waypoints to run a triangle around HL5 while the glider waits for the Hudson. Each leg of the triangle is about 3.5 km, and it is set to do the triangle once. After that the glider will return to it's recovery waypoint. The commands issued were as follows: Before the glider surfaced I paused the script, then after it surfaced: >>!dockzr GOTO_L10.MA -archive >>!type \mafiles\goto_l10.ma >>Ctrl-F Then I resumed the script
acomeau @
2013-04-17 22:59:58
At the 7:45 surfacing (local) on 17-Apr-2013, I wanted to have the glider surface every 3 hours to help recovery efforts for tomorrow. To do this I updated the glmpc.mi mission and I set the when sec for surfacing (timeout) to 10800 seconds. I also updated the goto_l10.ma file and made sure it only contained the final waypoint. Here is the commands I used: >>Ctrl-c >>dockzr GLMPC.MI -archive >>type \missions\glmpc.mi >>dockzr GOTO_L10.MA -archive >>type \mafiles\goto_l10.ma >> run glmpc.mi

Latest Mission Data

Temperature

Pot. Density

Salinity

Chl a from Fluorescence

Irradiance

CDOM fluorescence