Mission #26 (OTN200)

Status
  • Battery: -> V
  • AmpHrs:
  • LeakDetect: OK
  • Vacuum: inHg

Mission Diagnostics Page

Mission ran from (2013-10-15 17:25:00 til 2013-10-20 13:30:00)
Posted By:
pye @
2013-10-15 16:44:58
Glider deployed out of Ingomar, NS by Adam Comeau and Christena MacDonald
pye @
2013-10-17 00:42:05
Glider made connection to backup dockserver.
acomeau @
2013-10-20 01:05:03
I paused the surface script at 10:00 pm (local time) so that the glider could go into last gasp properly.
pye @
2013-10-21 18:12:33
Glider recovered by Adam Comeau and Richard Davis @ 10:30am ADT October 20th 2013.
rfdavis @
2014-10-24 21:08:51
mission ended due to suspected fluorometer leak. This mission had OTN200 running with OTN201's science bay while the fluorometer for 200 were being replaced.

Latest Mission Data

Temperature

Pot. Density

Salinity

Chl a from Fluorescence

Irradiance

Backscattering @ 660 nm

Backscattering @ 880 nm

CDOM fluorescence