Mission #46 (DL)

Status Mission Diagnostics Page
DL is AT SEA, last contact: 2015-06-25 14:11:00 UTC, (1222437 minutes ago)
Posted By:
slorsa @
2016-02-03 15:39:08
2015-06-11: Sue, Brad and Kat left Dingwall harbour on the the Bay Leader I to deploy DL in Aspy Bay (46 53.100' N, 60 22.320' W). This will be a two week mission to track tagged snow crab in Cabot Strait. Once DL in water, we used a test tag to verify VR2C functionality. All tests completely successfully and glider at full power.
slorsa @
2016-02-03 15:50:12
2015-06-11: DO sensor is not functioning. CTD+DO unit was sent to Seabird for routine maintenance, possible it was turned off during this time.
slorsa @
2016-02-03 16:08:15
2015-06-12: We will begin with a zigzag patrol. Each transect is 13km in length and spaced 1.4km apart. This allows some overlap assuming a detection range of 800m. This range can very depending on type of tag and water conditions.
slorsa @
2016-02-03 16:18:27
2015-06-18: Completed zig zag transect, will head SE of patrol area to perform expanding spiral patrol out to 2.3km from station 1. Spirals are spaced ~550m apart to give an idea of detection range.
slorsa @
2016-02-03 16:25:39
2015-06-19: Completed search spiral around station 1. As we return to the VPS array, we will complete one additional 13km transect - extending the S portion of the patrol box. Multiple tags were detected on DL's last transect.
slorsa @
2016-02-03 16:32:11
2015-06-20: Will perform search spiral out to 2.4km from center of VPS array. Spacing between spirals range from 450-600m.
slorsa @
2016-02-03 16:38:54
2015-06-21: Completed search spiral around VPS array. Will begin return track to Aspy Bay for recovery. On route home, DL will continue with several 13km zig zag transects to extend patrol box N. Spacing decreased to 1.2km for these transects.
slorsa @
2016-02-03 16:41:11
2015-06-23: Completed transects, will make best track to Aspy Bay for June 25th recovery.
slorsa @
2016-02-03 16:43:05
2015-06-24: DL arrived to recovery location early. Put into holding pattern until crew arrives for June 25th recovery.
slorsa @
2016-02-03 16:50:39
2015-06-25: Sue, Brad and Kat recovered wave glider on the Bay Leader I in Aspy Bay for completion of 2015 Cabot Strait mission to track tagged snow crabs. Umbilical had one twist, small patch of paint scuffed off float and light housing had crack with obvious water damage to light. Returned to Dingwall harbour with no issues.